Accessibility

Accessibility

Website Zoom

Color/Contrast

Download Reader

The Sitting of the National Assembly has been adjourned to meet again on Monday, the 29th April, 2024 at 4.00 p.m.
Print Print

Government Committed To Resolve Energy Crises: Says NA Deputy Speaker

Sunday, 2nd August, 2015

Islamabad; August 2, 2015:  Deputy Speaker Murtaz Javed Abbasi has welcomed announcement Ministry of Water and Power to build a grid station in District Mansehra. The grid station will be built with cost of 20 million US dollars.  This project will be built by National Transmission and Despatch Company (NTDC) and 120 kanal of land has already been acquired for this purpose.

The construction of the grid station is scheduled to be initiated from September, 2015 and will be completed in December 2016.The decision was made in the light of long lasting demand of the locals due to severe issue of low voltage of electricity being transmitted in the area that resulted in distribution crises of power.

Murtaza Javed Abbasi, Deputy Speaker National Assembly, has congratulated the people of Mansehra and said that the government was committed to resolve the issues of energy crises and poverty in the country and was taking all possible measures to provide basic amenities to masses at their door step. He said that Unfortunately, previous governments had neglected Hazara Division in the past but the current government was taking keen interest for development and to resolve power shortage of area. He assured that similar projects will be started in other parts of the Hazara Division in future to fulfill the electricity needs. He thanked the Prime Minister Muhammad Nawaz Sharif and Minister for Water Power for approval of grant for construction of grid station in District Mansehra.